Serbia: Reservoir Capital gets location permits for Serbian hydro plants
, InvestorsReservoir Capital Corp has been granted Location Permits for both the Brodarevo 1 and Brodarevo 2 dam sites, reservoirs and accompanying facilities in Serbia; the final step prior to applying for building permits for the projects.
The Location Permits have been granted based on the conceptual engineering and design documentation filed by the company for the construction of the dams.
Prior to obtaining the permits, Reservoir obtained positive opinions, approvals and different permits from a number of government institutions – namely EMS Serbia – Serbian Power Transmission Company, Institute for Protection of Cultural Monuments, Public Utility Company Lim Prijepolje, Service for Real Estate Cadaster Prijepolje, Republic Hydro-meteorological Institute of Serbia, Ministry of Energy, Development and Environmental Protection, Ministry of Construction, Traffic and Infrastructure, Public Water Company Srbijavode, Ministry of Agriculture and Environmental Protection, Republic Directorate for Water Management, Ministry of Mining and Energy, Railways of Serbia, Institute for Nature Conservation of Serbia, Ministry of Interior – Sector for Emergency Situations and the Ministry of Defense.
The location permits give the company the legal right to start project construction before obtaining the building permit.
source: waterpowermagazine.com
LATEST NEWS
- June 14, 2023 The Serbian Institute for Critical Materials launches a regional mining platform for knowledge exchange
- August 13, 2023 Environment South East Europe Watch temporarily suspends the activity
- August 9, 2023 Regional Coalition Aims to Protect Up to 400 Kilometres of Rivers Across Southeast Europe
- August 9, 2023 Meeting Serbia’s Energy Needs: A Smart Siting Map for Solar Power